2011 Completed Road Projects:

  • Arcadia Scenic Overlook on M-22 — Deck replacement and foundation stabilization.

  • Bronson Lake Road — Between Reynolds Road and Lake Ann Road in Inland Township. The proposed work includes 1 mile of chip sealing, fog sealing and pavement markings.

  • Copemish Road — Resurface 1/2 mile.

  • Demerly Road — between Raymond Road and Forrester Road in Blaine Township. The proposed work includes paved shoulders and super elevation corrections as well as removal and replacement of the existing guardrail.

  • Joyfield Road at Putney Road — Intersection in Blaine Township. The proposed work includes tree removal and earth excavation to create Clear Sight Triangles on both approaches of Putney Road at Joyfield Road, looking east.

  • Kast Road/Arner Road — Resurface 1 mile of Kast Road and 450’ of Arner Road (Joyfield Township).

  • Lake Michigan Road Boat Launch — A new launch was installed in conjunction with Benzie County and Parks and Recreation.

  • Lindy Road — Colfax Township. Replace the existing culvert approximately 200’ east of the Laughing Horse Saloon.

  • Marshall Road — between Eastman Road and CB Drive in Homestead and Benzonia Townships. The proposed work includes paved shoulders and removal and replacement of the existing guardrail.

  • Mick Road — between Raymond Road and Rice Road in Blaine and Joyfield Townships. The proposed work includes trenching, paved shoulders, and removal and replacement of the existing guardrail.

  • Reynolds Road — Between US-31 and Fewins Road in Inland Township. The proposed work includes 1 mile of chip sealing, fog sealing, and pavement markings.

  • Sliverville Road — Chipseal from Paul Rose Road east to the Nugent Road (Gilmore and Blaine Townships).

  • Wallin Road — Replace existing culvert (Colfax Township).

  • Skip Paving — Intermittent paving on Mick, Joyfield, Putney and Gorivan Roads.

2010 Completed Projects Include:

  • Adams Road — Chip Seal with participation from Crystal Lake Township

  • ARRA Projects
    • Lake Michigan Road — Chip Seal and Sign Upgrades
    • N. Manistee County Line Road — Guardrail and Chip Seal
    • River Road — Chip Seal and Sign Upgrades

  • Beulah Park Drive — Rehabilitation and Resurfacing with participation from Benzonia Township.

  • Burnt Mill Bridge over the Platte River — With participation from the Conservation Resource Alliance

  • Carlson Road — Chip Seal with participation from Crystal Lake Township

  • Cedar Run Road Safety Project — Rumble Strips and Sign Upgrades

  • Didrickson Road — Chip Seal with participation from Crystal Lake Township

  • Hulbert Road — Culvert Replacement and Seasonal Road Upgrade with participation from Inland Township, MDNRE, and Conservation Resource Alliance.

  • Nelson Road — Chip Seal with participation from Crystal Lake Township

  • Reynolds Road Safety Project — Sign Upgrades

  • Robinson Road — Chip Seal with participation from Crystal Lake Township